The contract level
What has been agreed is often not what the system shows – it only comes to light when someone reads the contract.
Home / Solutions / kanQ PM
kanQ PM · Property Management
The documents say one thing, the system sometimes says another. Alongside these, there are supplementary agreements, addenda and amendments that have accumulated over the years. In most cases, nobody has ever checked whether the data fits together.
In day-to-day business, a lot works for a surprisingly long time. It only gets interesting when contradictions surface. That is when the question arises: where does each value come from – and which one is right?
What has been agreed is often not what the system shows – it only comes to light when someone reads the contract.
What is missing or contradictory only becomes visible when you check item by item.
What has been cleaned up once does not stay correct by itself. Without recurring maintenance in a defined place, quality erodes continuously.
You know the consequences: blind spots and uncertainty, contradictory reports, missing decision bases, high manual data maintenance effort, liabilities.
A system import does not resolve contradictions.
It only adopts them faster.
The audit model
The completeness and consistency audit holds four sources against each other — checking exactly where data and contracts diverge.
Data quality is not an IT topic.
It is the foundation of proper property management.
What comes out of it: Findings per contract and unit, prioritised gap list, clean-up preparation, decision basis for the roll-out.
Data readiness for the real estate industry
Together we check the documents against the rent charged. A guided master data project with AI support. No tool, no system replacement.
Trust in data.
AI-supported
Extraction and verification automated, every value with its source reference
Microsoft-based
On Microsoft Fabric, in your own data lake, visualised in Power BI and analysed with CoPilot (LLM)
GDPR-compliant
No record ever leaves the secured audit environment
EU-hosted
Processing exclusively in European data centres
kanQ PM · The guided master data project
We check, item by item, whether contract, system, supplementary documents and filing match. Every finding has a source reference. You don't get a score, you get findings – no new tool, no system replacement.
Findings per contract and unit – with a source reference instead of an opinion: file, page, passage.
Open items, prioritised and assigned to a responsible party.
After approval, structured return into your existing system – your system stays where it is.
Typical occasions: Clean-up of portfolio data. Takeover and change of property manager, acquisition and sale (due diligence), financing. The completeness and consistency audit per file is part of kanQ PM.
The starting point
Data truth doesn't start in your system. It starts with data quality.
Bad data is not a cosmetic flaw. It is the silent risk in every portfolio.
Index, term, deposit, area, special agreement. Signed, but rarely complete in the system.
Property, unit, tenant, rent charged, service charge key. Maintained by people, over years, under pressure.
The amount the tenant pays and the owner receives. Its correctness is usually not checked item by item.
A plain system import carries over not only data but also legacy data errors. The goal is not a system replacement but a transferable, transparent and complete data basis.
What Q can decide, you decide.
What requires judgement is reviewed by your team.
Why kanQ
We don't deliver a grade or a recommendation, but a finding you can show to a third party — the owner, the bank, in case of dispute the court.
Service
Four building blocks, each commissionable on top of the previous one.
What we offer is not software but a solution with expert guidance.
Initial screening per contract and unit. Reconciliation of contract, addendum, system export, side lists and filing.
one-off
Structured gap and plausibility list, prioritised by risk, effort and responsibility.
one-off
Clean-up from the agreed maturity level: mapping, duplicate logic, mandatory field standard, handover into the ERP.
one-off
Ongoing quality assurance after the takeover: critical fields, new gaps, quarterly report.
recurring
What is audited
MRG, WEG, WGG and mixed-use buildings. Eight audit fields per contract and unit.
No finding without a source reference.
Rent charged against contract, addendum and resolution.
Clause, threshold, lever, effective date, actual enforcement.
Agreed, collected, evidenced on the deposit account.
Validity, written form, extension.
Contract area against system area against billing area.
Agreed key against applied key.
Option exercised, rate, treatment of vacancy.
What is missing for proper management.
The process
Secured area, EU-hosted — the handover sets the cut-off date.
What you provide
Follow-up request: missing documents
Every invoiced amount against the document that supports it.
What is there, what doesn't match, what is missing — with source reference.
Sorted according to the system you have defined.
Maturity level achieved, remaining open items.
Back into the system — verified, cleaned, documented
How it works
Request, review, follow up, clean, structure, return.
All data in the secured environment. For the audit, for the clean-up, and afterwards.
Effort on your side
On your side remain one workshop and two review rounds.
4
one per legal regime: MRG, WEG, WGG, mixed-use
3
your effort for the workshop, plus two alignment calls
2
for document delivery and the one-off adaptation to your system environment
0
leave the secured, EU-hosted environment
The path
A concrete audited portfolio beats any generic pitch deck.
Pilot goal: know within a few weeks whether the portfolio needs cleaning or completion and is therefore exposed to risk.
Don't talk big. Audit a portfolio.
Interactive example · anonymised
Click through the completeness check using a new-build handover – from creating the property through checkpoints and findings to the handover dossier.
Click “Start audit” and walk through the 6 steps using Wohnanlage Sonnenhang.
67 documents, 49 checkpoints – what is missing has never been checked systematically.
Click through the six steps of the completeness check using Wohnanlage Sonnenhang: from creating the property to the handover dossier.
Questions & answers
kanQ PM holds four sources against each other: contracts including addenda, the export from the management system, side lists and the filing. The result is a finding per contract and unit with its source reference, plus a prioritised gap list.
There are four catalogues for the Austrian regimes MRG, WEG, WGG and mixed-use buildings. Together they contain over 1,000 audit points, for example on indexation, fixed terms and deposits.
On your side, one workshop and two review rounds remain. The audit itself runs at kanQ.
No. kanQ is not a new management system and does not replace an ERP. It works on your existing systems.